Flagship Campaign

Legacy Builders ₦200M Campaign

“Building today. Blessing generations.”

The journey has begun. Ground has been broken, foundation work is underway, and blocks are being moulded. With your support, we will continue building a lasting legacy for future generations of seminarians.

Campaign figures are confirmed and reported to the membership by the SHSAOBA Executive at each AGM — verified totals will be published here once released. No live payment feed.

On Site & In Vision

What's Rising Today. What It Will Become.

Groundbreaking signage showing the Ultramodern Kitchen and Refectory project
On Site Today
The Project Signage

Photographed at the seminary — the official groundbreaking board with the approved architectural renderings and project details.

Photorealistic exterior rendering of the completed Ultramodern Kitchen and Refectory Building
Future Vision
Ultramodern Kitchen & Refectory

Architect's rendering of the completed building — the shared table where the next generation of seminarians will gather.

Project Status

Where We Are Today.

Honest, milestone-based updates. This status board is refreshed as each real milestone is reached on site.

Completed
  • Groundbreaking Ceremony
  • Foundation Casting
In Progress
  • Foundation Excavation
  • Block Moulding
Upcoming
  • Block Laying
  • Lintel Construction
  • Roofing
  • Finishing Works
  • Commissioning
Campaign Gallery

From The Site & The Drawing Board.

Completed

Groundbreaking Ceremony

Photographed on site during the official groundbreaking.

The Bishop lays the first block
The Bishop lays the first block
Blessing of the foundation
Blessing of the foundation
Alumni and clergy in prayer
Alumni and clergy in prayer
In Progress

Foundation Excavation

Real photos and footage from the site — the excavated foundation trench.

Excavated foundation trench Site Footage
Site overview during excavation Site Footage
Foundation excavation at the SHSAOBA building site — Terraced foundation trench with profile pegs set out
Terraced foundation trench with profile pegs set out Site Photo
Foundation excavation at the SHSAOBA building site — Stepped trench running the length of the site
Stepped trench running the length of the site Site Photo
Foundation excavation at the SHSAOBA building site — Excavated trench across the seminary compound
Excavated trench across the seminary compound Site Photo
Foundation excavation at the SHSAOBA building site — Excavated earth beside moulded blocks stacked on site
Excavated earth beside moulded blocks stacked on site Site Photo
In Progress

Block Moulding

Real footage from the site — 9,000 blocks moulded and on ground to date.

9,000Blocks moulded to date
Moulded concrete blocks on site — press play for soundWith Audio
More blocks stacked on site Site Footage
Thousands of moulded concrete blocks stacked in rows on the SHSAOBA building site
9,000 moulded blocks stacked in rows on site, awaiting block laying Site Photo
Future Vision

Architectural Renderings

These images show the completed building as designed — not the current state of the site.

3D architectural model — front-left angle
3D architectural model — front-left angleFuture Vision
3D architectural model — front-right angle
3D architectural model — front-right angleFuture Vision

Every Block Tells a Story.

Make yours part of the Sacred Heart legacy.

Join the Legacy Builders